Since you will be cutting into the floor in a later step you will remove anything on top of.
How to repair bathroom floor in mobile home.
You never know what you will find once you start remodeling your manufactured home bathroom so be prepared for anything when you start tearing out wall panels and bathtubs.
Scope it out and protect for.
In order to seal properly with a new wax ring the flange should be sitting flush on top of the new finished flooring and be anchored to it with screws.
Buy enough a c 3 4 exterior grade plywood to completely cover the bathroom floor.
After you ve made the cut you can remove the linoleum or vinyl covering easily.
Vinyl will usually need to be cut around the perimeter of the room and tile will need to be ripped up.
Mobile home repair has a great article about repairing or replacing a mobile home bathtub here.
Remove the trim and floor covering the first step to replacing rotted flooring in a mobile home is to remove the trim and floor covering.
Hacksaw the closet bend pipe under the flange but leave enough pipe between the fittings to install a fernco coupling.
You will also need screws long enough to go through the plywood and the existing flooring and the new vinyl or carpet you will be putting down i really prefer vinyl.
I wrote how to install laminate flooring to show exactly how it can be done and how it looks in a mobile home.
For most floors in a mobile home i think wood laminate flooring makes a lot of sense.
Next begins the cutting stage.
If you re dealing with linoleum or vinyl then you ll need to make a cut around the outer edges of the room.
Mobil homes trailer houses have the worst luck for floor damage from water or what ever.
I know i know this sounds like it will be the best thing ever.
If it s carpet you will need to remove the strips.
Here i show you how to fix it.
On the same note you ll also need to remove any trim along the floor s perimeter.
Or the water or insects responsible for the damage could spread to the floor joists or wall studs and the cost to replace the floor joists and subfloor will be much higher than simply replacing a section of the subfloor.