Determine your starting wall.
How to put laminate flooring on concrete floor.
Many types of flooring can be installed over a concrete sub floor.
My contractor wants to install laminate on top of floor.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
Work with patience and make sure you don t leave any gaps between the laminate planks.
Then vacuum the floor with a wet dry vac or sweep it with a broom.
Laminate flooring is a good alternative to wood flooring in basements.
After removing the existing flooring baseboards and quarter moulding check that the subfloor is solid flat and clean.
You will lay the flooring lengthwise to this wall.
Then nail the flooring planks with a standard flooring nailer see photo for details.
However many homeowners are disappointed to discover that solid wood flooring cannot be installed on a concrete slab.
Laminate flooring is also fairly easy to install.
Before the installation itself leave laminate boards in the room for some time.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Measure and mark the center of all four walls at floor level.
Perhaps the easiest way to improve the insulation of a floating vinyl floor on concrete is to install a thermal underlayment preferably made of cork felt or a similar material.
In colorado dry basement built 1961.
Laminate flooring is ready to install as long as the base floor is clean and smooth.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Make a final check with the level to be sure all the high and low spots are gone.
Snap the chalk line over the top of the concrete or moisture barrier between the marks on opposite walls making a cross in the center of the room.
Before you install file flooring follow the directions above for fixing high spots and low spots in a wood or concrete subfloor.
When installing a laminate floor on top of old tile on top of concrete basement floor.
How to install laminate flooring over concrete important.
Fix concrete subfloors with a patching compound and for wood subfloors remove protruding nails and replace any damaged boards.
If you lay the laminated flooring on new concrete floors you must know that the period of the complete drying is about 80 days.
Work with patience and make sure you don t leave any gaps between the laminate planks.
Lay laminate flooring on the rest of the concrete floor in the same manner described above.