While one person holds the flashlight the other person should use a staple gun to run the wire along the rafters from one entry hole to the other.
How to under attic floor problems for pipes and wires.
On 2020 04 18 by ken the old house guy mod no there are not.
The solid base.
The staple gun should be loaded with wire staples designed for holding the size and type of wire you are running.
Wire from the basement to a first floor outlet.
House is a open floor plan so not a lot of support walls below.
Again i only have access to see under the attic floor and basement ceiling.
I would keep the wires centered in the joists at all times and use the nail plates as shown above by other poster over every single wire that goes through a joist member.
It involves installing outlets switches and potentially water supply lines and drainage pipes if a bathroom will be added.
It seems like a lot of work to remove gas pipes.
Once your route has been mapped out calculate the amount of wire or cable you ll.
From down in the basement the bottom of the floorboards.
Wire from the attic to a second floor outlet purple.
The photo below shows what is perhaps the best fiberglass batt installation i ve ever seen in a floor system.
Wire from the attic to the basement using a second floor hvac return green.
Attic flooring consists of materials as basic as sheets of plywood as well as more elaborate interlocking floor systems.
That creates a problem in support for storage floor and only using support walls below.
Which ever way i go i know there will be alot of lines running parallel through the attic.
Lan to use 2x4x36 upright screwed to ceciing joist every 24 to hold 2x6x12 s up above duct work.
The code specifies 1 25 below surface of board face but this really applies to areas of a residence whereby sheetrock would be installed and not for attic flooring.
Just arrow and 6 on 2020 04 18 by mod age of cast iron electrical box light fixture supports.
Btw my existing pb pipe is under the slab.
It may also be a good idea to scan the wall using a metal detecting stud finder to locate obstacles like copper plumbing pipes and metal ductwork that may be hidden in the wall.
For a first floor installation you will be drilling up through the floorboard and then sole plate.
The third problem compression reduces the r value of the insulation and is usually a result of the batts not being cut to the right size and not being fit properly around the obstructions wires pipes ducts.
Modifying an attic floor s joist system is a job for the pros.
When the pex is run throug the attic does it matter if it is run along the floor or if it is run about 4 feet above the floor along the verticle truss supports.
Next examine the location from the attic crawlspace or basement to see if it s accessible and free of hidden wiring or plumbing.
Wire from the attic to the basement near the flue blue.