Add an additional row of fas teners midway between the joists to pull the layers tightly together.
How to strengthen a 2x8 floor joist.
You can however strengthen the joists by securing another length of wood to the existing joist called sistering or reduce wobbly floors with block inserts between the joists called.
If the attic joists are not adequate one way to strengthen the floor for live loads is to sister the old joists.
The most common way joists are repaired is to sister it up.
Essentially sliding a whole member beside it and nail the heck out of it from both sides with a lot of nails.
If you want to attach drywall to the ceiling later you ll have to install strips of 3 4 in.
The plywood runs parallel to the joists not across them.
A day until they re level.
If the new sister bears on wood at least 1 5 on each end then you re good to go.
How to sister a floor joist.
Plywood or 1 4 to the undersides of the exposed joist ends.
Set a hydraulic jack and post under the beam and jack up the joists about 1 8 in.
Framing lumber is the typical.
When installing on the underside of the joists the process is the same.
Doing so strengthens weak joists and can help straighten sagging joists.
To prevent sag in 2x6 s and strengthen at same time you could secure lengths of stainless steel or galvanized cable attach at each end of individual ceiling joists have cable go over a one or two spreaders or strut projecting down from the underside of the ceiling joist maybe 12 14 or so as not to lose too much headroom these could.
Long sheets are centered on the span leaving the ends of the joists exposed.
Then glue and screw the plywood to the joists.
Currently i have removed the partition wall between the closet and bathroom to move it over 1 5 feet for a larger bathroom.
Properly sistering floor joists is very important and should not be rushed to save time.
Since this is a repair of a faulty or damaged floor joist it is imperative to do this project correctly and there are a few big mistakes to avoid.
Choose ring shank nails or screws that are long enough to penetrate the joists by 11 2 in and space them every 6 in.
Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall.
Total space of closet and bathroom is 13 4 by 5 4.
The most common mistakes in this method would be not nailing the sisters.
Tack a beam under the sagging joists.
In the case of 2x6 joists you can pair them up with additional 2x6 joists by nailing them together.
Joists and orient panel ends over joists.
Sistering is the process of adding a new joist next to each existing joist.
I have an bathroom and walk in closet off the master bedroom that sits halfway over my garage.