This will create a weak spot.
How to raise multiple floor joists.
Start by cutting out a small 1 2 in 2 5 5 1 cm section of the floor joist with a reciprocating saw.
Set a hydraulic jack and post under the beam and jack up the joists about 1 8 in.
Hi i wouldn t lay your boards directly on to the rockwool take the 2nd rock wool out and relay all insulation between joists then fit a 35mm x 45mm batten to the top of the existing ceiling joists to take the loft boarding make sure you pre drill the timber and use 2 1 2 inch 8 screws.
This job can run you 1 000 and 5 000 depending on the extent of the job.
Wooden shims are often used to work out squeaks and stabilize spongy areas but they can also be used for slight adjustments to specific places.
You don t need many screws into the battens then lay the boards t g loft boards would be best for.
Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall.
Follow the rules to keep your floor solid.
Then use pry bars and your reciprocating saw to pry and cut the floor joist away from the subfloor.
The notching and boring rules of thumb for solid lumber are shown in fig.
You can notch and bore joists without sacrificing critical strength but you must follow the rules.
Leveling the floor with shims is when you attach thin wedge shaped pieces of wood on top of the low areas of the joists to make the top joists even.
Joists need to be sistered to be repaired.
Tack a beam under the sagging joists.
If your home is more than 20 years old your floor joists are most likely solid wood 2x8s 2x10s or 2x12s.
When a joist is sistered a healthy board is run parallel and attached to the faulty one to transfer the load.
Pry the floor joist from the subfloor with the back of your hammer.
If you have an uneven floor you may need to think about leveling floor joists with shims.
A day until they re level.
Then set new joists same height as existing ones alongside the old.
If the correction is minor only a 1 4 inch over an 8 foot span using shims between the floor joist and the subflooring can often rectify it without the need to raise the floor joist with a jack.