Lay a loose plank of your new flooring upside down against the door casing over a piece of the underlayment and saw off the bottom of the casing.
How to put down a stainmaster laminate floating floor.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
You will see a gap on the long side joints when the plank is rotated down.
In this video i am showing how to install laminate flooring for the first time.
Most diyers can complete laminate floor installation in one day.
In fact laminate flooring can be installed in almost every room in your home including kitchens since it doesn t have to be glued down and doesn t involve grout or mortar.
Cut down casings when your flooring doesn t fit underneath it.
Watch how to prepare the subfloor for laminate flooring.
Insert the tongue of the second row plank into the groove of the first row plank at a slight angle until the laminate edges meet.
Here are some common floating floor transition and trim install mistakes that can lead to potential repairs down the road.
If you re trying to install flooring around doors for example you might find that the floating floor doesn t quite fit beneath the casing.
How to install laminate flooring.
For the next plank join the short end of the plank first image 2.
Planks can be cut with a hand saw circular saw or flooring cutter and most laminate flooring comes in planks that simply snap together with a tongue.
Install plank at an angle when installing the next plank in the row lift the plank at an angle to allow it to set lock in place and tap the plank against the previous plank in the row with a mallet.
Trim these door casings with a flush cut dovetail saw if the flooring doesn t fit underneath the casings.
Next rotate down until the joints lock image 1.
This guide will show you which type of underlay is most suitable for your project.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
According to home depot if you re laying the laminate flooring in a room that s below grade or prone to high humidity and moisture you should also put down a vapor barrier to protect the floor from moisture.
Use a handsaw to undercut door molding or casing.
They could even become loose creating a safety concern.
Fastening the transition to the flooring and subfloor one common mistake is gluing or nailing transition strips to the floating floor and the subfloor.
Before fitting boards over concrete always put down a damp proof membrane dpm to stop moisture coming through.