If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a circular saw about 1 8 inch above the level of the new flooring.
How to prep a concrete floor for glue down hardwood.
For floating floors it helps eliminate separation and deflection.
A sidebar offers advice on checking the concrete slab for moisture before you start.
Plan to nail down the engineered hardwood flooring when you have a wood subfloor.
Since you ll be using the subfloor as a means to fix your hardwood one it s imperative that the sub floor s surface is clean dry and as smooth as possible.
For glue down wood floors good prep makes the actual installation easier creating efficiencies in production.
Good to know if you need to cut the door get the approximate layout of the cut and use masking tape on top and bottom of the cut line to reduce splintering as the cut.
Getting ready to install engineered hardwood.
The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
3 apply non flammable paint stripper to stubborn glue mastic and paint to loosen it.
Scrape the majority of any glue mastic grease and paint from the floor with a putty knife or a floor scraper.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
When leveling actually flattening a slab don t allow more than 3 16 difference in.
How to install glue down engineered wood flooring on concrete slab preparation.
With a sand and finish floor good prep helps eliminate chatter and other problems.
Gluing works well when you are installing engineered hardwood over a concrete subfloor but be sure you clearly understand the manufacturer s application instructions before you glue that floor.
There are three ways to do it and the glue down method that you ll see in this video is great for concrete sub.
This step by step guide written by a florida flooring contractor covers everything from leveling the slab to laying out and installing the tongue and groove planks for glue wood flooring.