It s much more affordable to simply pour concrete over the existing floor if it s in good shape than to demo a floor that s in poor condition before installing the new one.
How to pour a concrete floor over a basement.
Pour the fresh concrete over the floor then go over it with a 1 4 gauge rake to bring it level image 2.
As any general contractor knows a concrete basement floor must be level and it must be poured in sections to prevent cracking.
Use this self leveling concrete for mak.
The best proportions when pouring a basement floor are 6 gallons of water for every 1 cubic foot of cement.
Step 1 place plumbing stubs.
If you are building a new house and plan to pour your first basement you will need a good set of instructions such as those below.
In this video we show you everything you need to know to make perfect level floor using self leveling floor compound.
Mix and pour the concrete mix the concrete according to the directions with a mixing bit on a heavy duty drill image 1.
Pour when your best buddies are available and equip them with rubber boots safety glasses and rakes.
Our painted and polished concrete floor guide also might be useful.
Once the pour has started the liquid material should be evenly spread over the area using the rakes.
An inspection by a highly rated contractor will help you determine your needs.
Place strips of 1 2 inch plywood against the two concrete basement walls in the first.
Mix it until it is the consistency of a thick pancake batter.
Put your dry ingredients into a wheelbarrow and make a well in the center like you do.